Uploaded September 2020 | Updated November 2026, 2 days ago
fab-form.com/fastfoot/versa.php
With rising lumber prices, see how Fastfoot saves thousands of dollars on this large residential project.
There are over 500' of concrete footings on this project. The builder was able to save time and money forming all of them with just 2x4's, instead of purchasing expensive 2x12"s.
Moving 1/4 the amount of lumber around site drastically reduces the labor needed onsite. Keeping everyone happy.
Fastfoot will also act as a cappillary break. Prevent water entering the home through the footing.
fab-form.com/fastfoot/versa.php
With rising lumber prices, see how Fastfoot saves thousands of dollars on this large residential project.
There are over 500' of concrete footings on this project. The builder was able to save time and money forming all of them with just 2x4's, instead of purchasing expensive 2x12"s.
Moving 1/4 the amount of lumber around site drastically reduces the labor needed onsite. Keeping everyone happy.
Fastfoot will also act as a cappillary break. Prevent water entering the home through the footing.










