Once 4 levels of block and steel are complete, install lower bracing. IMPORTANT: never leave a wall unbraced - a gust of wind can blow it over.

Screw-attach lower level Zonts™ 6' on center so the 2x4 waler is above the side support, using two 1-1/2" #8 coarse wood screws. Continue around inside perimeter. Screw-attach Zonts™ directly above the lower Zonts™ at top of fourth block.

Place 2x4 walers into Zont™ saddles and screw from below with the 2x4 waler is touching the Zont™ vertical face. For joints in walers, scab a 6' 2x4 on top of joint to provide continuity. In corners, toe-nail 2x4s together to prevent waler movement.

Screw attach 2x4 vertical strongbacks in position at least 12' on center (more can be installed as required), using the slot in the side of the zont.

Place the screw in the lower half of the slot to allow for wall settlement. IMPORTANT: Back off screw 1/2 turn to allow for vertical movement of Zont™ on strongback.
Using Conventional ICF Bracing

Screw attach a 2x4 ribbon around the interior of the foundation located on top of the side supports. Set each brace on top of the 2x4 and screw attach to the ICF webs. Run a small brace from the 2x4 to the ground to lock in position as required. NOTE: we strongly recommend using Zont™ bracing with the MP System for two reasons: first, the strongbacks take all scaffolding loads (not the ICF wall); and second, the base of the strongback is staked firmly to the ground preventing all wall movement.
IV - Align Lower Wall

Once walers and strongbacks are installed on the four levels of block, accurately align the wall as detailed below:
X-Y Alignment

Corners: Accurately position each corner 1"away from adjacent string line. The wall can easily be moved in small increments - lift each side of wall and move slightly; then move down wall and repeat. Alway lift slightly so there is no danger of bending adjusters. When corner is correctly positioned, drive stake beside each strongback, and screw stake to strongback to lock in position. If ground is soft, place a plywood pad under the base of the strongback.

Straight Sections: Have one person located on outside of the wall with 1x4 spacer and one person on the inside with a 2' level to ensure strongback is plumb. Move wall until it is located exactly 1" away from the string line. Drive a stake at the base of the strong back and screw strongback to stake. Continue around perimeter.
Vertical Alignment

Use two people: the person on the inside adjusts side support so that top of fourth block is at the exact height; then the person on the outside uses a 2' level and adjusts his height by plumbing the wall.
Install Angle Braces

Install 2x4 angle braces between the mid to upper end of the strongback and stake solidly to the ground. Use Zuckles (turnbuckles) at top end of angle brace to accurately plumb wall.
ICF Monopour : Zont BracingZont™ Insulated Concrete Form (ICF) BracingAnother Builder Making the Switch to Fastfoot™ | #diy #fastfootwork #footings #constructionHow to Brace ICF Walls | Zote™ ICF Storage SystemLeveling your ICF walls20 Tall Insulated Concrete Form PourPrepping for the Pour With ZontBracing™ System #construction #framingWatch the Fastfoot Footing Liner Bulge (Sped Up) #Shorts #fyp #concreteZont Bracing System TestimonialHow to Brace ICF Walls | Zee™ T-Form BracketSkip the Steps — Theres an Easier Way to Form Footings | Fastfoot™ #diy #formwork #constructionThe Most Peaceful Concrete Pour Youll Ever See Fastfoot Footings #Shorts #concretepouring