Uploaded March 2021 | Updated September 2026, 2 weeks ago
ESTMZ™ Enhanced Single-Trip Multizone Completion System is designed for use in deepwater and ultra-deepwater offshore completions. The ESTMZ™ system enables several intervals within a well to be isolated and treated with a high-rate frac pack during a single trip of the workstring.
Full 10,000 psi differential pressure rating
Highest rated frac and proppant rating in the industry
Largest system ID in the industry
Modular screen provides formation isolation
Capture short, low reserve intervals that would normally be bypassed
Accommodates SmartWell® system completions
The Deepwater Completion Solution Example
Halliburton's ESTMZ™ system has the potential to save up to 42 days of rig time on a five zone (1,400 foot producing interval) Lower Tertiary completion. Based on a $1 MM spread rate that is a $42 MM savings!
© 2021 Halliburton. All Rights Reserved.
ESTMZ™ Enhanced Single-Trip Multizone Completion System is designed for use in deepwater and ultra-deepwater offshore completions. The ESTMZ™ system enables several intervals within a well to be isolated and treated with a high-rate frac pack during a single trip of the workstring.
Full 10,000 psi differential pressure rating
Highest rated frac and proppant rating in the industry
Largest system ID in the industry
Modular screen provides formation isolation
Capture short, low reserve intervals that would normally be bypassed
Accommodates SmartWell® system completions
The Deepwater Completion Solution Example
Halliburton's ESTMZ™ system has the potential to save up to 42 days of rig time on a five zone (1,400 foot producing interval) Lower Tertiary completion. Based on a $1 MM spread rate that is a $42 MM savings!
© 2021 Halliburton. All Rights Reserved.










