Uploaded September 2024 | Updated November 2026, 3 hours ago
An EPD Laboratories call covering four projects at once. Eric Dollard reports the third volume of his Heaviside book finished, work he describes as roughly eighteen years built on top of forty years of his own mathematical experimentation, begun from scratch with almost no reference books after the Landers facility was destroyed. Griffin Brock covers his work on the radiating beam tube, where an aluminium getter placed behind the electrode is used to hold the vacuum and extend a tube life he puts at 30 to 50 hours. Hakasays describes rebuilding Steve McGreevy's earth-signal receiver with a Sallen-Key filter at the JFET input, reporting around 60 dB of rejection of local power line noise, and Justin Miller walks a photo record of what a month-long work episode at the Tonopah facility actually involves.
Chapters
0:00:00 Where the donations go
0:03:15 The Heaviside book is finished
0:07:19 An ELF receiver for seismic warning
0:09:20 A getter for the radiating beam tube
0:23:55 A next generation McGreevy receiver
0:32:08 Inside a month-long work episode
1:09:37 Rebuilding the language of electrical engineering
1:16:40 What getting on the air costs
epdlabs.org/seismic-streaming
ericpdollard.com/donate
emediapress.com
emediapress.com/energytimes
EPD Laboratories, Inc. live video call, recorded 2024-08-16. Posted 2024-09-06.
An EPD Laboratories call covering four projects at once. Eric Dollard reports the third volume of his Heaviside book finished, work he describes as roughly eighteen years built on top of forty years of his own mathematical experimentation, begun from scratch with almost no reference books after the Landers facility was destroyed. Griffin Brock covers his work on the radiating beam tube, where an aluminium getter placed behind the electrode is used to hold the vacuum and extend a tube life he puts at 30 to 50 hours. Hakasays describes rebuilding Steve McGreevy's earth-signal receiver with a Sallen-Key filter at the JFET input, reporting around 60 dB of rejection of local power line noise, and Justin Miller walks a photo record of what a month-long work episode at the Tonopah facility actually involves.
Chapters
0:00:00 Where the donations go
0:03:15 The Heaviside book is finished
0:07:19 An ELF receiver for seismic warning
0:09:20 A getter for the radiating beam tube
0:23:55 A next generation McGreevy receiver
0:32:08 Inside a month-long work episode
1:09:37 Rebuilding the language of electrical engineering
1:16:40 What getting on the air costs
epdlabs.org/seismic-streaming
ericpdollard.com/donate
emediapress.com
emediapress.com/energytimes
EPD Laboratories, Inc. live video call, recorded 2024-08-16. Posted 2024-09-06.










