EPA Post-Construction Soil Sampling Update @ThePirateLab
EPA Post-Construction Soil Sampling Update  @ThePirateLab
Uploaded November 2025 | Updated November 2026, 3 days ago
This was our update on Saturday, November 22, 2025.

Our soil sampling occurred during a rising tide (about +5 feet at this recording) which manifest as some water intrusion just inside the construction fence line, spreading into the primary construction zone about to be planted in the coming weeks. This constructed levee and berm system is designed to protect the city of Palo Alto's sewage treatment plant from rising seas and improve water quality in nearby bay surface waters..

This phase of soil sampling was crucial to establish the baseline of various materials/contaminants within the soil matrix (e.g. glass, plastics). Over time, this baseline will allow us to objectively assess which contaminants may be coming from the sewage treatment plant versus what was introduced during the construction activity. Ultimately, this comparison will help determine if this constructed levee effectively captures different types of plastic from the wastewater treatment plant.
EPA Post-Construction Soil Sampling UpdateYellowScan LiDAR Orientation (First Flight)-Part4BRW at Snug Harbor Happy Hour-PappaWoodlands Plots 16-18 March 2026Da SpeakeasyResearch Integrity in the Era of AIForedunesDeer Creek Spring Overview-RAWLouisiana Wetland Loss from BourreeAEmerita Sand CrabsCultured Abalone TanksGrunion Ecology
Sean Anderson |

EPA Post-Construction Soil Sampling Update

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER