Uploaded August 2026 | Updated September 2026, 2 weeks ago
Doom wad: "Mad Mushroom Salad With Disgusting Salad Dressing"
00:00 Mad Mushroom Salad With Disgusting Salad Dressing Map01
02:18 Mad Mushroom Salad With Disgusting Salad Dressing Map02
---
Wad/File: nuketnel.wad
Game/Base iwad: Doom II
Date: 10/23/10
Author: Vaporizer
Link: doomworld.com/idgames/levels/doom2/m-o/nuketnel
Description: My first completed level ever. I made this for a Doom II mapset called "Imp Sector". I made this level a long ago, but I'm putting it into the archives because for some reason Imp Sector was never put into the archives and I wanted this thing to the archives. Because this is my early work, it obviously looks like crap, but I think this level plays quite well. (V)
Doom wad: "Mad Mushroom Salad With Disgusting Salad Dressing"
00:00 Mad Mushroom Salad With Disgusting Salad Dressing Map01
02:18 Mad Mushroom Salad With Disgusting Salad Dressing Map02
---
Wad/File: nuketnel.wad
Game/Base iwad: Doom II
Date: 10/23/10
Author: Vaporizer
Link: doomworld.com/idgames/levels/doom2/m-o/nuketnel
Description: My first completed level ever. I made this for a Doom II mapset called "Imp Sector". I made this level a long ago, but I'm putting it into the archives because for some reason Imp Sector was never put into the archives and I wanted this thing to the archives. Because this is my early work, it obviously looks like crap, but I think this level plays quite well. (V)










