Uploaded January 2014 | Updated September 2026, 20 hours ago
[view in full screen in 720p HD if able or 480p resolution]
[Correction of various video details the 300w is a Sun-Share 3 phase 12v 6-blade]
[NOT shown in video is R and X Technology 400w-600w SF-600-5 3 phase 12v 5-blade]
[NOT shown in video is Controller (programmable LCD) is a EPWSC06A (200w - 600w Wind) (and 12v 150w Solar) Jiangsu Ecopower Solution Co.,Ltd ]
all from "aliexpress".
[This controller in this video is a12v LED Hybrid non-programmable (200w - 600w Wind) (12v 150w Solar) bought on "ebay"]
[Blue solar controller is PWM 12v solar charge controller SMG50 ( 50A - 600w) Shanghai Saipwell Electric Co., Ltd. from aliexpress]
Initial testing of tiny hybrid(wind solar) off grid power system generators. Using a 300w 3 phase(correction) "Hyacinth 6 blade 12 volt AC three phase" wind turbine and 3 x 80w 12v panels.
On a 3.5 meter pole.
It is quite true that if the modern house were not connected to the grid , a 2Kw solar controller and a 2Kw wind controller(wind turbine mounted at least 12 meter high or 15 meter above trees) at 48v battery and and (2 x 8Kw inverter -Warn never never join outputs together of two individual inverters to raise power or damage will result!!!! - each are separate and would be out of phase - use the correct size for the job) could be used by replacing inbuilt oven and grill with a 2000w electric hot plate for saucepan, a 1000w accessory grill, a 2000w fry-pan, and a 1100w microwave-grill oven(Warn! - these can draw around 4000w for a period of seconds in use), 1500w kettle, and last but not least a 160 Litre Dux hot water system with a 2400w element.
You can near do that from a set of 2500w inverters. What remains is the computer 500w ,lights=1000w and the TV and air-conditioner would need to be a portable. The battery bank would need to be at least 24 x 80ah deep cycle with a 10 year life-cycle at 20 degrees Celsius and 1400-30-percent-DOD rating. A large number of jobs would be one after the other. Refrigerators and freezers are can be found reasonable size for good energy consumption - e.g. 400 - 500Kwh per annum .
(DIY)
http://www.windsolarhybridaustralia.x10.mx
[view in full screen in 720p HD if able or 480p resolution]
[Correction of various video details the 300w is a Sun-Share 3 phase 12v 6-blade]
[NOT shown in video is R and X Technology 400w-600w SF-600-5 3 phase 12v 5-blade]
[NOT shown in video is Controller (programmable LCD) is a EPWSC06A (200w - 600w Wind) (and 12v 150w Solar) Jiangsu Ecopower Solution Co.,Ltd ]
all from "aliexpress".
[This controller in this video is a12v LED Hybrid non-programmable (200w - 600w Wind) (12v 150w Solar) bought on "ebay"]
[Blue solar controller is PWM 12v solar charge controller SMG50 ( 50A - 600w) Shanghai Saipwell Electric Co., Ltd. from aliexpress]
Initial testing of tiny hybrid(wind solar) off grid power system generators. Using a 300w 3 phase(correction) "Hyacinth 6 blade 12 volt AC three phase" wind turbine and 3 x 80w 12v panels.
On a 3.5 meter pole.
It is quite true that if the modern house were not connected to the grid , a 2Kw solar controller and a 2Kw wind controller(wind turbine mounted at least 12 meter high or 15 meter above trees) at 48v battery and and (2 x 8Kw inverter -Warn never never join outputs together of two individual inverters to raise power or damage will result!!!! - each are separate and would be out of phase - use the correct size for the job) could be used by replacing inbuilt oven and grill with a 2000w electric hot plate for saucepan, a 1000w accessory grill, a 2000w fry-pan, and a 1100w microwave-grill oven(Warn! - these can draw around 4000w for a period of seconds in use), 1500w kettle, and last but not least a 160 Litre Dux hot water system with a 2400w element.
You can near do that from a set of 2500w inverters. What remains is the computer 500w ,lights=1000w and the TV and air-conditioner would need to be a portable. The battery bank would need to be at least 24 x 80ah deep cycle with a 10 year life-cycle at 20 degrees Celsius and 1400-30-percent-DOD rating. A large number of jobs would be one after the other. Refrigerators and freezers are can be found reasonable size for good energy consumption - e.g. 400 - 500Kwh per annum .
(DIY)
http://www.windsolarhybridaustralia.x10.mx







![Short About - the Sydney Industrial Feral Bee Swarm Captured
[ In NSW October long weekend is the Labour Day(eight hour day) long weekend ]
See the hive entrance they came from in a Sydney Industrial building wall beside a footpath : https://www.youtube.com/watch?v=MQdKhhL9NuI
(note: the feral hive entrance video shows the Langstroth hive in late mid winter with no NSW registration painted on the front - the bees were not tempted and were eventually scraped from the wall during swarm in October)
This is nine days later from the Monday ending of the Queens Birthday long weekend in October 2015
This is a swarm of feral bees scraped from a Sydney industrial building wall. They swarmed on the Queens Birthday Holiday long-weekend in October 2015. They were placed in the hive on the Monday ending.
This is about them after 9 days introduction to the hive.
The hive is a 10-full-deep Langstroth with migratory lid(will add the other sections when they are properly established).
Only one frame has foundation wax template, the others i am hoping they will draw on themselves. Short About - the Sydney Industrial Feral Bee Swarm Captured](https://i.ytimg.com/vi/HWZI7F9kztc/mqdefault.jpg)

![(Bowfishing) RETRY SHOT 1 (30 yards)
[view in full screen in 720p HD if able or 480p resolution]
Canoe and paddle board bow fishing practicality.
Filmed 350Km inland at Eon Dry Gulch, Australia. (Bowfishing) RETRY SHOT 1 (30 yards)](https://i.ytimg.com/vi/I0i38IMPaGA/mqdefault.jpg)
![Tram accident fatality (person fallen under and dragged by tram) George St. Sydney CBD ,NSW
Sydney, New South Wales, Australia, George Street, A person fell under the tram in the CBD at approximately 11:55 PM Wednesday 10th May , some people shouted at the driver to stop but he did not pull up until he reached the Chinatown stop 100 yards on across Goulburn street down Brickfield Hill. At present half an hour later (Thursday 11th May) the Police emergency response and fire brigade are working on getting to the person whom appears to be deceased.
[Updated] It was fatal, The first police vehicle to arrive took 5 minutes at 600 meters to the police station in central CBD, The responding technical emergency crew were ten minutes to arrive, and it was two hours before the technical crew cleared their tools. The tram weighs around 40 tonnes and the only sensible way of getting under it would be a 50 to 80 tonne capacity crane , or heavy ram jack system to tilt the tram.
A sixteen year old girl was the victim.
Sydney Morning Herald
https://www.smh.com.au/national/nsw/teenage-girl-dies-after-becoming-trapped-under-tram-in-sydney-s-cbd-20230511-p5d7i3.html
Nine News com.au video report
https://youtu.be/l3_69zXLPC4
UPDATE May 20th
After I leaved the area an hour after the incident , the light rail vehicle had not at any time been lifted or tilted by anything by any means! period!
This news article appears to be assumption!
https://youtu.be/xjfMkJ3bbEY Tram accident fatality (person fallen under and dragged by tram) George St. Sydney CBD ,NSW](https://i.ytimg.com/vi/Iv25ZiiZnU8/mqdefault.jpg)