Diablo Canyon: The Devil’s in the Details; A Mothers Work Is Never Done (Part 2)  @MsMilkytheclown1
Diablo Canyon: The Devil’s in the Details; A Mothers Work Is Never Done (Part 2)  @MsMilkytheclown1
MsMilkytheclown1 | Diablo Canyon: The Devil’s in the Details; A Mother's Work Is Never Done (Part 2) @MsMilkytheclown1 | Uploaded September 2016 | Updated October 2024, 5 minutes ago.
It's Just a Game of Russian Roulette - Every Day Diablo Canyon is Open. A chilling interview about How Diablo Canyon should have NEVER been BUILT. Utility owner Pacific Gas and Electric (PG&E) announced in June 2016 that it would shut down the Diablo Canyon nuclear power plant with its two atomic reactors by 2025 due to a joint proposal made by PG&E and several environmental and labor organizations. This action is neither the beginning nor the end to the decades long story of Diablo Canyon’s design, construction, and operation. PG&E’s promise to replace the nuclear power generated by Diablo Canyon’s two reactors with renewable energy and to no longer seek a 20-year license renewal for these atomic reactors still comes with significant costs. The two are reactors located on multiple California fault lines and now will continue to operate for nearly a decade more. In the second part to this Fairewinds Energy Education Podcast series, the Fairewinds Crew will share the troubled history of Diablo Canyon and speak with the leading activists in opposition to Diablo Canyon’s ominous 50-year presence along the California coast.
The formidable San Luis Obispo Mothers for Peace have acted as legal intervenors to the construction, licensing, and operation of Diablo Canyon since 1973. During Part 2 of our Diablo Canyon series entitled “A Mother’s Work is Never Done”, Fairewinds President Maggie Gundersen talks with Mothers for Peace Vice President Linda Seeley about what it means to be a legal intervenor and why this watchdog role is so important when it comes to atomic power reactors. youtu.be/uIwel72DxEQ

AG: (30:40) I don’t’ know if you knew it, but I did a report for Friends of the Earth that showed that they were supposed to inspect the nuclear reactor vessel in 2014 for its 10-year inspection and they got the NRC to waive that and push it out into 2025 so that there you have one of the most severely embrittled reactor vessels in the world and the NRC has waived any inspection on it until after it gets its 20-year license extension. So that’s certainly a risk to the people of San Luis Obispo. For the next 10 years, you’ve got an uninspected nuclear reactor out there.

LS: I didn’t know that, Arnie.

AG: Certainly Diablo and the NRC weren’t interested in publicizing it and they tried to sneak it through, and effectively, they did. The license has been amended and there is no inspection between now and 2025.

LS: And there’s probably no way to address that now, because it’s done, right?

MG: Shouldn’t they have been notified?

AG: That’s right. There should have been a process back when they applied for that, but somewhere along the line, the vessel is not being inspected. The NRC gave them a 10-year waiver.

MG: Linda, thank you so much for joining us today and for being a part of this really critical conversation about nuclear power risk, atomic reactors, the West Coast earthquake faults and Diablo Canyon.

LS: Maggie, I appreciate so much your having invited me. I hope that people will pay attention to Diablo Canyon and will pay attention to all of the nuclear reactors that are still online and work as hard as they can to shut them all down.

CLICK HERE FOR THE FULL TRANSCRIPT tinyurl.com/jml3mh3

HERE IS PART ONE: Diablo Canyon: The Devil’s in the Details. A Troubled History (part 1) youtu.be/XcwfpGaPWa8

Here is my DIABLO CANYON Playlist: tinyurl.com/hmzt5c4
Here is my Arnie Gundersen Playlist: tinyurl.com/hjegl7n

Diablo Canyon nuclear plant never should have opened tinyurl.com/zsneq7n
Diablo Canyon: The Devil’s in the Details; A Mothers Work Is Never Done (Part 2)Fukushima Reactor #4 Building (Inside & Top Floor) on 4/23/12Fukushima Melted Reactors & FOOLS Pool According To MITHanfords Extreme Radiological Dangers & St. Louis Protests EPA (Nuclear Hotseat #256)Fukushima 6 Years On:  Rads Kill EverythingSobering Thoughts of Fukushima@5 by Arnie Gundersen of Fairewinds EnergyFukushima Meltdowns: 2000+ Days On (The Age of Fission) 9/2/16New: Fukushima vs. Red Tide & Domoic Acid w/ Rense, Yoichi Shimatsu, & Dana DurnfordFukushima ☠ Pop Quiz ☠ Extra Credit ☠Brand New: The iGeigerbrator™CGS Whistleblowers: Deplorable Nuclear Safety Record & Radiation Exposure 3rd Worst for BWRsFukushima: TEPCO Seeking Melted Nuclear Fuel Update 1/2/16

Diablo Canyon: The Devil’s in the Details; A Mother's Work Is Never Done (Part 2) @MsMilkytheclown1

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER