CSM: Fold Over Cuff Down Socks with E-Wrap 1x3 Ribber Selvage @CSMLove
CSM: Fold Over Cuff Down Socks with E-Wrap 1x3 Ribber Selvage  @CSMLove
Uploaded January 2022 | Updated September 2026, 2 days ago
Utilizing the E-Wrap Scallop/Vandyke Selvage outlined in a vintage Autoknitter circular sock machine manual, here is the full and final step by step pattern on this sock design.

A fold over cuff not your cup of tea? Make the leg segment longer or shorter - the world is your oyster.

ALL OF MY SOCK VIDEOS CAN ALSO BE FOUND ON MY WEBSITE UNDER THE MENU “My Patterns and VIDEOS” in the "Socks-Cuff Down" page: csmlove.com/sockscd

Almost half of this video was recorded during a spontaneous live video demo Jan 14, 2022. Apologies for my voice as I was still recovering from an intense RSV strain of the flu from Dec 29, 2021.

Want to watch just the Selvage? youtu.be/E9cpGUJBfwY
Written pattern csmlove.com/s/csm_focd_scallopedribsocks.pdf

How to close the toes - Kitchener - youtu.be/9VPfdHLcodA
Cast on/Starting on a CSM: See the csmlove.com/techniques
How I size my socks - csmlove.com/blog/tf7md6gqtlcnxbdsyqmhff536lo0z0

Looking for something specific and not finding it? Look it up by category - csmlove.com/index

Have a question? Email me at csmloveinfo @ gmail.com

My name is Karen Taylor (formerly Ramel).

Quick link - taplink.cc/csmlove

▬ Contents of this video ▬▬▬▬▬▬▬▬▬▬

0:00 - Intro
0:32 - Layout marking of a 72 slot cylinder
1:17 - Review sock features
2:08 - Where the 3 o'clock, 9 o'clock and 12 o'clock points are on the cylinder
4:44 - Further review of the sock
5:15 - Reviewing what a Deep Heel is compared to a regular Heel.
10:58 - Yarn used on first half sock demo shown
12:07 - Ravel Cord
19:35 - Starting with Sock Project yarn
30:21 - Adding Ribber needles (picking up three bars one ach added needle)
53:06 - Ribber setup is removed from the machine so that the heel can be worked.
57:15 - Heel start decreasing to heel marks
1:06:20 - Heel start increase - no wrapped Heel - work to include 3 needles behind halfway marks
1:11:59 - Heel done stop at 7 o'clock. Prep parked ribber needles and return ribber to sock
1:14:45 - Starting the 60 row foot we will work one row less.
1:15:58 - Swap remaining Ribber needles to Cylinder needles and remove Ribber from the machine. Work final row and prep for toe by stopping at 6 o'clock.
1:17:10 - Toe started on the decrease. Work to one needle before the marks.
1:18:59 - Toe increase start. Work to the left 9 o'clock hashmark.
1:21:10 - Move yarn carrier to 7 o'clock and lower all back needles. Work final row until just before 3 o'clock. Add scrap yarn and stitch markers as advised. Then setup for next sock.
CSM: Fold Over Cuff Down Socks with E-Wrap 1x3 Ribber SelvageCSM: How to Kitchener your sock (from the inside)CSM: Introduction to a new idea - “Universal Split Ring Flat Cast-On Bonnet”CSM: How I Make Demo Socks (Silent)CSM: Brake Upgrade for Tension Feed FixCSM Travel Storage StandCSM: Spa ClothBaseline: Yarn Carrier settingBrave Bunny from start to finishCSM: Bind-Off - Latch Hook-Long ON MACHINESelvage: E-Wrap 1x3 Scallop/VandykeCSM: Quick Review Cast On with Universal Bonnet
CSM Love |

CSM: Fold Over Cuff Down Socks with E-Wrap 1x3 Ribber Selvage

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER