Construction blitz at Mordialloc @levelcrossings
Construction blitz at Mordialloc  @levelcrossings
Uploaded September 2025 | Updated September 2026, 1 week ago
๐Ÿ‘ท More and more at Mordialloc!

๐Ÿฆบ Crews recently worked 24/7 to remove signalling infrastructure, demolish parts of the Mordialloc Station and platform, as well as dismantle the Bear Street boom gates.
Construction blitz at MordiallocBuilding bridges (part 3/3)Construction Wraps Up at Clyde Road, BerwickSunbury Line Is Boom Gate FreeConcrete job at Hopkins Road, TruganinaHopkins Road, Truganina โ€“ 89th level crossing gone for good70 level crossings are gone for goodPiling underway in MeltonRecycled steel in Truganina road bridgeLowering carbon emissions with calcined clayBrunt Road bridge in Beaconsfield is open to traffic โ€“ 76 level crossings goneReflecting on the Level Crossing Removal Project Graduate Program
Level Crossing Removal Project |

Construction blitz at Mordialloc

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER