Uploaded July 2017 | Updated September 2026, 1 hour ago
The Chongqing Metro Line 3 has a mix of 6 and 8 car trains operating on it. All stations are long enough to accomodate 8 car trains however the platform screen doors would need to be changed to operate the longer trains on the entire route in the future.
The Chongqing Metro Line 3 has a mix of 6 and 8 car trains operating on it. All stations are long enough to accomodate 8 car trains however the platform screen doors would need to be changed to operate the longer trains on the entire route in the future.










