Uploaded March 2022 | Updated November 2026, 3 hours ago
This video celebrates the international collaboration behind the creation of the largest stainless steel vacuum chamber in the world, the ITER cryostat. The last section, the top lid, was completed in March 2022 on the ITER site.
It took a family: ITER Organization (design), ITER India (procurement), Larsen & Toubro Heavy Engineering Division, India (manufacturing design, fabrication and assembly); MAN Energy Solutions, Germany (Larsen & Toubro sub-contractor for welding on the ITER site); SPIE Batignolles TPCI, France (Larsen & Toubro sub-contractor for the realization of the Cryostat Workshop on site at ITER); APAVE France (occupational safety).
This video celebrates the international collaboration behind the creation of the largest stainless steel vacuum chamber in the world, the ITER cryostat. The last section, the top lid, was completed in March 2022 on the ITER site.
It took a family: ITER Organization (design), ITER India (procurement), Larsen & Toubro Heavy Engineering Division, India (manufacturing design, fabrication and assembly); MAN Energy Solutions, Germany (Larsen & Toubro sub-contractor for welding on the ITER site); SPIE Batignolles TPCI, France (Larsen & Toubro sub-contractor for the realization of the Cryostat Workshop on site at ITER); APAVE France (occupational safety).










