ITER prepares for assembly operation @iterorganization
ITER prepares for assembly operation  @iterorganization
Uploaded October 2019 | Updated November 2026, 12 hours ago
At the top concrete level of the Tokamak building, pillars are being installed to support the steel structure of the future crane hall.
ITER prepares for assembly operationITER: Inauguration of the SPIDER ion sourceITER magnet completion eventITER by drone - August 2018ITER: Flying over... and throughThe principle is simple...ITER Safety Day 2023ITER @ EXPO 2025 in OsakaA third vacuum vessel sector arrives from Korea (making of)ITER at COP28!Last leg of the journey for poloidal field coil #6Sector 8 travels temporarily to the pit
iterorganization |

ITER prepares for assembly operation

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER