CCLINK and Cavitex C5 Link Expressway update as of April 2025 @dmitrivalencia
CCLINK and Cavitex C5 Link Expressway update as of April 2025  @dmitrivalencia
Uploaded April 2025 | Updated September 2026, 3 weeks ago
This video highlights the progress updates for the Cavitex C5 Link Expressway and CCLINK projects as of April 2025. Watch to see how these infrastructure developments are shaping up and driving faster connectivity.

Cavitex C5 Link Expressway Segment 3B: This is a 2-kilometer, six-lane toll road that will link the Kaingin area to the RSG Subdivision. It forms part of the larger 7.7-kilometer Cavitex C5 Link Expressway, which connects Cavite to Taguig, significantly improving travel efficiency

CCLink (Cavitex-CALAX Link): This is a 1.2-kilometer elevated expressway designed to connect the Cavitex Kawit Toll Plaza to the CALAX Kawit Interchange. It aims to enhance accessibility between Cavite and Laguna, easing traffic and benefiting thousands of motorists daily
CCLINK and Cavitex C5 Link Expressway update as of April 2025CALAX section 3 and 2 update as of January 2024Metro Manila Skyway Rainy Night Joyride  (asmr) - 2023CALAX Update as of December 2024  (subsection 3, 2 and 1)CLLEX Off and On ramp - update as of December 2025NAIAX Expansion project update as of June 2023Pinoy Joyride - AH26 Bulacan to Nueva Ecija Joyride 2024Pinoy Joyride - NLEX Connector - Harborlink Night Joyride 2025Pinoy Joyride - CALAX Westbound Joyride - Mamplasan to Tagaytay 2023#NLEXConnector section 2 opening soon!NLEX Candaba Viaduct Expansion (Third Viaduct) Project - First lifting of Double - T girderCALAX (Subsection 3 , 2 and 1) end of the month update - February 2025 Including CCLINK
dmitrivalencia |

CCLINK and Cavitex C5 Link Expressway update as of April 2025

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER