Built for the Moon. Driven to Win. | Lunabotics at Kennedy Space Center @NASAKennedy
Built for the Moon. Driven to Win. | Lunabotics at Kennedy Space Center  @NASAKennedy
Uploaded September 2026 | Updated November 2026, 5 days ago
Student-built rovers. Lunar terrain. High stakes competition at NASA’s Kennedy Space Center.

See the energy, engineering and excitement of Lunabotics as university teams put their robotic systems to the test in a simulated lunar environment.

These are highlights from the previous competition, as well as a look ahead as teams get ready for Lunabotics 2027.
Built for the Moon. Driven to Win. | Lunabotics at Kennedy Space CenterProtecting the Horseshoe Crab, A Far Out Mini EpisodeArtemis II Test Flight Crew Suit UpArtemis II Rocket Stacking Begins at NASAs Kennedy Space CenterSpacecraft Separation of NASAs IMAP, Carruthers, and NOAAs SWFO-L1 MissionsINTERNING AT KENNEDY: Our Unique History and Programs at Kennedy Space Center, Episode 1Cozy Vibes 🔥 at Kennedy Space CenterNASAs SpaceX Crew-13 Spacecraft SeparationNASAs SpaceX Crew-11 Launch Coverage Begins (1st Attempt)Far Out: A New Series on NASA+!MOON MINUTE: Artemis III Starship Human Landing System🚀 Stacking of NASAs Moon rocket continues!
NASAs Kennedy Space Center |

Built for the Moon. Driven to Win. | Lunabotics at Kennedy Space Center

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER