Uploaded May 2026 | Updated November 2026, 14 hours ago
Justin Miller brings the terminal cabinet down the pole to eye level at pole 26 so Eric Dollard can reach the terminal block with meters and instruments and see what the line is doing. This is the far end of the pole pair receiving antenna, with the other end running up to the shack on the hill. The video covers the work at the pole and what the terminal arrangement is for.
Chapters
0:00 What pole 26 is for
7:00 The receiving antenna terminates here
13:51 Working the line and the terminal block
epdlabs.org/seismic-streaming
ericpdollard.com/donate
emediapress.com/product-category/authors-presenters/eric-dollard
emediapress.com
emediapress.com/energytimes
EPD Laboratories, Eric Dollard at the long line. Posted 2026-05-29.
Justin Miller brings the terminal cabinet down the pole to eye level at pole 26 so Eric Dollard can reach the terminal block with meters and instruments and see what the line is doing. This is the far end of the pole pair receiving antenna, with the other end running up to the shack on the hill. The video covers the work at the pole and what the terminal arrangement is for.
Chapters
0:00 What pole 26 is for
7:00 The receiving antenna terminates here
13:51 Working the line and the terminal block
epdlabs.org/seismic-streaming
ericpdollard.com/donate
emediapress.com/product-category/authors-presenters/eric-dollard
emediapress.com
emediapress.com/energytimes
EPD Laboratories, Eric Dollard at the long line. Posted 2026-05-29.










