Stremaform® stay-in-place formwork for underwater construction of a bridge pier
Conventional formwork systems reach their limits when constructed underwater due to the high amount of manual labour required. Stremaform® enables considerable time savings during immersion operations and simplifies underwater construction and concreting work.
During the construction of a bridge pier for the bridge connecting Nerlandsøya and Bergsøya in Norway, formwork below the water surface was constructed entirely with Stremaform®, while conventional formwork was used above the waterline.
The Stremaform® sections were delivered prefabricated and erected on site. The construction of rounded corners also posed no problems, as this was easily possible using Stremaform®. Glass fibre anchor rods were used to secure the concrete pressure without affecting the concrete cover.
The entire pre-assembled Stremaform® formwork, including the reinforcement, was finally placed on a prefabricated foundation on the seabed, where the concrete was then poured.
Thanks to Metrostav Norge AS and Bertelsen&Garpestad AS for the great photos of the construction site!

More information:
_______________________________________
maxfrank.com/stremaform

Social media:
_______________________________________
Youtube: youtube.com/@MAXFRANKGroup
LinkedIn: linkedin.com/company/max-frank-group
Instagram: instagram.com/accounts/login/?next=/maxfrankgroup


Contact:
_______________________________________

Max Frank GmbH & Co. KG
Mitterweg 1
DE-94339 Leiblfing

Tel: +49 9427 189-0
info@maxfrank.de
maxfrank.com


MAX FRANK as a company:
________________________________________

We have been developing, producing and distributing a wide range of proven products for concrete and reinforced concrete construction for over half a century. We accompany our customers reliably through every building phase with a technically sophisticated and intensive intermeshing of industrial production, high-quality products and multifaceted services.

That is why we develop individual project solutions in an open dialogue with our partners. We are using innovations in structural physics geared toward longer life cycles and sustainability and we are striving to offer more efficient processes. We are assisted in this by our ability to listen attentively and ask the right questions, because good questions open up those involved in the construction to productive thinking processes and discussions beyond isolated views and prejudice. Questions that penetrate to the core of the task and help to gain new insights and stake off more and more common terrain.

We at MAX FRANK call that: BUILDING COMMON GROUND
Bridge connecting Nerlandsøya and Bergsøya, NorwayBridge foundations: sheet piling with Pecafil® formworkWarum die Bewehrung für den Erfolg entscheidend istTransverse force dowels Egcodorn® for longitudinally movable ceilingStremaform® Fugenabstellung für Kranfundamente – Einfach & sicher in Bodenplatten integrieren30 vs. 3 Jahre im Unternehmen – Zwei Perspektiven, ein Team6 Monate bei MAX FRANK - langweilig? Ganz sicher nicht.Pecafil® als Fundament-Schalung für vorgefertigte BewehrungskörbeVon der Produktidee zur Betonage - Fugenabstellung Stremaform®Lastfreischaltung BodenplattePecafil® strip foundations stiffened with lattice girdersRissüberbrückung mit dem Frischbetonverbundsystem Zemseal®
MAX FRANK Group |

Bridge connecting Nerlandsøya and Bergsøya, Norway

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER