To protect existing structures such as tunnels or channels from the load of a new construction above, the Egcovoid® settlement plate can create a load-free layer between the existing structure and the new construction.

The Egcovoid® settlement plate is quick to install, and cutting a plate to size is easily achievable with simple tools. The installation of valves allows hose connections between individual Egcovoid® settlement plates. The plates are connected with an irrigation hose. After concreting and reaching concrete load-bearing capacity, the plates are irrigated through the hose system for controlled watering. This ensures the correct functioning and thus the release of load through the statically indeterminate cavity created by the plates.

We would like to thank the client AUDI Neckarsulm as well as the construction company KLEBL Neumarkt for the opportunity to film on-site.


More information:
_______________________________________
maxfrank.com/egcovoid

Social media:
_______________________________________
Youtube: youtube.com/@MAXFRANKGroup
LinkedIn: linkedin.com/company/max-frank-group
Instagram: instagram.com/accounts/login/?next=/maxfrankgroup


Contact:
_______________________________________

Max Frank GmbH & Co. KG
Mitterweg 1
DE-94339 Leiblfing

Tel: +49 9427 189-0
info@maxfrank.de
maxfrank.com


MAX FRANK as a company:
________________________________________

We have been developing, producing and distributing a wide range of proven products for concrete and reinforced concrete construction for over half a century. We accompany our customers reliably through every building phase with a technically sophisticated and intensive intermeshing of industrial production, high-quality products and multifaceted services.

That is why we develop individual project solutions in an open dialogue with our partners. We are using innovations in structural physics geared toward longer life cycles and sustainability and we are striving to offer more efficient processes. We are assisted in this by our ability to listen attentively and ask the right questions, because good questions open up those involved in the construction to productive thinking processes and discussions beyond isolated views and prejudice. Questions that penetrate to the core of the task and help to gain new insights and stake off more and more common terrain.

We at MAX FRANK call that: BUILDING COMMON GROUND
Lastfreischaltung BodenplattePecafil® strip foundations stiffened with lattice girdersRissüberbrückung mit dem Frischbetonverbundsystem Zemseal®Expanding waterstop Cresco® -Sealing in water change zonesPecafil® - ein paar wenige Werkzeuge und es kann mit dem Fundament begonnen werden!Wie verbindet man Stremaform® mit Stufenfalz bei einer Schwarzblech-Ausführung?Trittschall im Treppenhaus? Egcostep & Egcoscal einfach erklärt – Ortbeton vs. FertigteilEffiziente Lösungen für Baugruben mit Pecafil®Fundamentbau mit Pecafil®: Schnell, präzise und wirtschaftlichTrinkwasserbehälter mit geringen Lunkern betonierenUnterfangungen - Kaftschlüssige Verfüllung mit ZementleimEine sichere und zeitsparende Fugenabdichtung und Fugenabstellung mit   Stremaform® und Fradiflex®
MAX FRANK Group |

Lastfreischaltung Bodenplatte

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER