Uploaded September 2023 | Updated September 2026, 3 hours ago
The 20-story, Beirut Hilton Hotel, which was built in 1975 but never occupied, was demolished using implosion methods, on Sunday, July 14, 2002. The demolition was conducted by Controlled Demolition, Inc. (CDI) of Phoenix, Maryland, and Optimal Engineering Consulting & Contracting SARL (OECC) of Antelias, Lebanon.
#demolition
#subscribe
Copyright 2002
Controlled Demolition, Inc. &
Loizeaux Group of Companies
The 20-story, Beirut Hilton Hotel, which was built in 1975 but never occupied, was demolished using implosion methods, on Sunday, July 14, 2002. The demolition was conducted by Controlled Demolition, Inc. (CDI) of Phoenix, Maryland, and Optimal Engineering Consulting & Contracting SARL (OECC) of Antelias, Lebanon.
#demolition
#subscribe
Copyright 2002
Controlled Demolition, Inc. &
Loizeaux Group of Companies










