Behind the Scenes of a Major Traffic Shift @everydayengineering
Behind the Scenes of a Major Traffic Shift  @everydayengineering
Uploaded September 2025 | Updated September 2026, 1 week ago
As part of the State Street project in New Haven, CT, a significant traffic shift was implemented overnight for the morning of 9/23/25. The existing 4-lane divided roadway was shifted into a 2-lane road all on one side of the medians with new lane striping and temporary traffic signals, to allow the contractor to begin building the improvements on the former northbound lanes. This new traffic pattern is now similar to how State Street used to look before the 1980s, when the former 2-lane city street was widened into 4 lanes as part of urban renewal, requiring the demolition of all buildings on the east side.
Behind the Scenes of a Major Traffic ShiftState Street Project - Construction Update 12Signal Separation for a Bike PathPedestrian Bumpouts for Crosswalk SafetyState Street Project - Construction Update 11New Traffic Signal with Hot Pedestrian ButtonRCUT Traffic Signal & Pedestrian CrossingState Street Project - Construction Update 7Milling & Paving as Pavement PreservationPilgrim Monument Inclined ElevatorGrand Opening of the Farmington Canal Trail in New HavenDutchess Rail Trail, NY
Everyday Engineering |

Behind the Scenes of a Major Traffic Shift

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER