Uploaded September 2026 | Updated November 2026, 5 days ago
View from the rear of eastbound Amtrak California Zephyr Train 6 as it enters the 2 mile long Tunnel 41, aka the Big Hole, over Donner Pass. Tunnel 41 was built in 1925 to supplement the original 1869 Track alignment over the summit. Today the original 1869 Track 1 alignment lies unused by Union Pacific after it was found to be surplus to requirements after the UP/SP merger.
Waiting for Amtrak Train 6 to pass is an eastbound Union Pacific manifest freight with UP ES44AC #7472, SD70ACe #9024 and AC4400 #6511.
View from the rear of eastbound Amtrak California Zephyr Train 6 as it enters the 2 mile long Tunnel 41, aka the Big Hole, over Donner Pass. Tunnel 41 was built in 1925 to supplement the original 1869 Track alignment over the summit. Today the original 1869 Track 1 alignment lies unused by Union Pacific after it was found to be surplus to requirements after the UP/SP merger.
Waiting for Amtrak Train 6 to pass is an eastbound Union Pacific manifest freight with UP ES44AC #7472, SD70ACe #9024 and AC4400 #6511.










