Nick breaks down a transition detail of “Wrapping the Rim Joist” at this project in Boone, NC. You know the air barrier must be continuous, without interruption around the entirety of the conditioned space - inboard of the main insulation layer, thereby keeping the conditioned air within the conditioned space, optimizing efficiency and minimizing the chance of moisture damages. Of course, things get tricky at junctures and in particular at rim joists and the perpendicular floor joists tying into them. One way to make continuity at the rim joist is an approach we call “Wrapping the Rim Joist,” which Nick discusses here.
Wrapping the Rim JoistPre-Make Airtight Window Corners With Tescon ProfilInsulation Sound Attenuation Test: Rock Wool, EPS & GUTEX Wood Fiber BoardIntro to INTELLO X: Vapor-Variable Membrane Built For UV / Weather ExposureHow To Prep A Window Opening With ADHERO475 Tape Performance Lab - The Underwater Tape TestUsing Passive House Concepts To Build A DIY Modernist SaunaIntroducing the PR-60 Glass Roof System from LamiluxOver-Insulated Window Rough-Opening ExplainedThe Importance of Air Barrier SequencingB Collective Prefab Passive HouseIntro to EXTOSEAL ENCORS: Flexible, Durable, Waterproof Sill Tape
475 High Performance Building Supply |

Wrapping the Rim Joist

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER