Uploaded May 2025 | Updated November 2026, 1 hour ago
Another quick check of the progess of the Worcester Union Station passenger platform. This video was recorded on May 4, 2025 (not 2024 as announced near the start of the video). It looks like both sides of the platform will be in operation this summer. The rails between the station and the platform will only be used by the MBTA as there will be no way to connect to the rails west of the station. Both Amtrak and MBTA trains will use the side of the platform away from the station. The project will be completed after both sides of the platform are put in use.
Other platform videos I've posted:
March 2023 youtube.com/watch?v=HD3min0vGrQ
May 2024 youtube.com/watch?v=1Gk2UdH0v1o
July 2024 youtube.com/watch?v=yQTY_HSrORQ
MBTA train departs July 2024 youtube.com/watch?v=QwoEmERdvIc
Another quick check of the progess of the Worcester Union Station passenger platform. This video was recorded on May 4, 2025 (not 2024 as announced near the start of the video). It looks like both sides of the platform will be in operation this summer. The rails between the station and the platform will only be used by the MBTA as there will be no way to connect to the rails west of the station. Both Amtrak and MBTA trains will use the side of the platform away from the station. The project will be completed after both sides of the platform are put in use.
Other platform videos I've posted:
March 2023 youtube.com/watch?v=HD3min0vGrQ
May 2024 youtube.com/watch?v=1Gk2UdH0v1o
July 2024 youtube.com/watch?v=yQTY_HSrORQ
MBTA train departs July 2024 youtube.com/watch?v=QwoEmERdvIc










