This is Part 3 of our off-grid power install series. We don't just sell power systems; we run them. We're building a full off-grid system on my own RV, start to finish.
Before any gear ships, every system gets a validation call with our team. In this one, Dan Heming, one of our engineers, walks through my Pro bundle against my 2026 Alliance Paradigm 395DS to make sure it fits the way we actually live in it:
- Split-phase vs. parallel inverters, and why split-phase lets us set a lower shore power input limit (handy on a Harvest Hosts extension cord)
- Balancing the 3 ACs, microwave and kitchen circuits across both inverters
- Starting with 2 batteries, with room for 4 later
- The high-amp 12V module for the hydraulic jacks and slides
- Adding 4 new solar panels to the factory 400W panel, for about 1,200W total
- Cerbo GX, touchscreen and VRM remote monitoring
- What happens at install and commissioning in Delaware, Ohio
Doing a DIY install? The validation call is your chance to confirm everything with one of our engineers before the gear ships.
Missed Part 2? Watch it here: youtu.be/r7JOmwRfRlI
Start with Part 1: youtu.be/ACEkhuQLdEU
Series playlist: youtube.com/playlist?list=PLBq6Of3gn_8I
WANT A SYSTEM LIKE THIS?
Off-grid power systems: mobilemusthave.com/pages/off-grid-power
Talk to a power expert (free consult): mobilemusthave.com/pages/talk-to-a-power-expert
Subscribe so you don't miss the install. youtube.com/@MobileMustHave?sub_confirmation=1
#offgridpower #rvlife #solarpower #victron #rvsolar #fifthwheel #mobilemusthave #offgridliving
0:00 Intro: the validation call
0:16 Reviewing the Pro bundle
0:43 The RV: 2026 Alliance Paradigm 395DS
1:04 50 amp, no generator, dual inverters
1:27 Split-phase vs. parallel inverters
2:20 Balancing loads across both legs
2:49 The loads: 3 ACs, washer/dryer, kitchen
3:32 Which ACs run on the inverters
4:23 Starting with 2 batteries (room for 4)
5:01 Hydraulic jacks and slides: high-amp 12V
5:55 Alternator charging: skipped for now
6:12 Solar: 4 new panels + factory 400W
7:18 Cerbo GX, touchscreen and VRM
9:13 Connectivity: 4G included, Peplink on board
9:38 Install and commissioning in Ohio
10:54 Final questions
11:30 Why every system gets a validation call
12:05 Next up: the install
Try out our free Off-grid power builder: mobilemusthave.com/pages/off-grid-power-system-configurator
This is Part 3 of our off-grid power install series. We don't just sell power systems; we run them. We're building a full off-grid system on my own RV, start to finish.
Before any gear ships, every system gets a validation call with our team. In this one, Dan Heming, one of our engineers, walks through my Pro bundle against my 2026 Alliance Paradigm 395DS to make sure it fits the way we actually live in it:
- Split-phase vs. parallel inverters, and why split-phase lets us set a lower shore power input limit (handy on a Harvest Hosts extension cord)
- Balancing the 3 ACs, microwave and kitchen circuits across both inverters
- Starting with 2 batteries, with room for 4 later
- The high-amp 12V module for the hydraulic jacks and slides
- Adding 4 new solar panels to the factory 400W panel, for about 1,200W total
- Cerbo GX, touchscreen and VRM remote monitoring
- What happens at install and commissioning in Delaware, Ohio
Doing a DIY install? The validation call is your chance to confirm everything with one of our engineers before the gear ships.
Missed Part 2? Watch it here: youtu.be/r7JOmwRfRlI
Start with Part 1: youtu.be/ACEkhuQLdEU
Series playlist: youtube.com/playlist?list=PLBq6Of3gn_8I
WANT A SYSTEM LIKE THIS?
Off-grid power systems: mobilemusthave.com/pages/off-grid-power
Talk to a power expert (free consult): mobilemusthave.com/pages/talk-to-a-power-expert
Subscribe so you don't miss the install. youtube.com/@MobileMustHave?sub_confirmation=1
#offgridpower #rvlife #solarpower #victron #rvsolar #fifthwheel #mobilemusthave #offgridliving
0:00 Intro: the validation call
0:16 Reviewing the Pro bundle
0:43 The RV: 2026 Alliance Paradigm 395DS
1:04 50 amp, no generator, dual inverters
1:27 Split-phase vs. parallel inverters
2:20 Balancing loads across both legs
2:49 The loads: 3 ACs, washer/dryer, kitchen
3:32 Which ACs run on the inverters
4:23 Starting with 2 batteries (room for 4)
5:01 Hydraulic jacks and slides: high-amp 12V
5:55 Alternator charging: skipped for now
6:12 Solar: 4 new panels + factory 400W
7:18 Cerbo GX, touchscreen and VRM
9:13 Connectivity: 4G included, Peplink on board
9:38 Install and commissioning in Ohio
10:54 Final questions
11:30 Why every system gets a validation call
12:05 Next up: the install