Wholeo Rising - Installing Panel 1: Triangulation @carolingwholeo
Wholeo Rising - Installing Panel 1: Triangulation  @carolingwholeo
Uploaded December 2023 | Updated September 2026, 1 hour ago
Following N-S frame alignment on November 28, 2023, we installed the first stained glass panel on it. Positioning Triangulation as created and reinstalled three previous times, insures that the rest of the panels fit together and attach to the frame correctly.
Wholeo Rising - Installing Panel 1: TriangulationOrchid Tour 4: Parrot Pitcher PlantMel Geary StudioOrchid Tour 1: Getting Started with John Bente and Jeff TalbertGreat Spirit Path Stone Poem - Color Bell with AuraBeyond Frame of ReferenceWholeo Dome Programmable Yoga Mat DesignHealing 4 Me And TheeFollow the Sand, Wholeo Movie 2024 60-second TrailerTwo Great Blue Herons, 2017About Sand: quotes by Robert M. PirsigFifth Installment: Evolutionary Array
Caroling Geary |

Wholeo Rising - Installing Panel 1: Triangulation

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER