1. Zero net loading
2. Ease and speed of construction
EPS blocks can be easily placed by contractors with little or no experience.
Lower placement rates
EPS blocks are easily handled by two workers by hand
3. Construction without utility relocation
No utility replacement that should be considered in the design and selection process.
4. Placement in adverse weather conditions
The higher material cost of EPS block Geofoam are offset by lower installation costs.
5. Alleviates the costs of
Soft soil removal
Excavation widening
Temporary dewatering
Possible need for an excavation support system
6. Saves Time!!!
Solution for soil where estimated time rate of settlement of soil exceeds acceptable standards
Solution for situations where costly corrective fill measures still resulted in significant settlement or stability over time
7. Reduction of lateral stress on bridge approach abutments
Solution for underlying soft soil that is too soft & compressible to carry designed load
8. Allows access to crucial pathways for construction equipment
9. Reduction of Horizontal and Vertical Forces on Structures/Walls
Solution for high lateral loads behind retaining structures
10. Vertical Embankments
Use of a fill geometry with vertical sides as opposed to the more traditional sloped-side geometry will provide the following advantages:
The volume of fill material, especially of the EPS blocks, is minimized, which reduces both material cost and construction time.
The footprint of the embankment and concomitant right-of-way acquisition is minimized, which can have cost, environmental potential, and other benefits.
Alleviation of the need to acquire additional right-of-way to construct flatter embankment slopes because of the low density of EPS blocks and/or the use of a vertical embankment
11. Likely elimination of the need for surcharging and staged construction
12. Decreased maintenance costs
A result of less settlement from the low density of EPS Geofoam &
Excellent durability with a life expectancty of more than 100 years &
Consistent material properties
13. No need for environmental permits
Contains no CFC, HCFC, or HFC
Contains no formaldehyde
Can be recycled
Inert, non-nutritive, highly stable
Will not decompose
Will not decay
Will not produce gases
14. Slope stabilization
15. Vibration dampening
16. Landscape Fill
17. Weight reduction for underground structures/parks
EPSFoamPro.com
1. Zero net loading
2. Ease and speed of construction
EPS blocks can be easily placed by contractors with little or no experience.
Lower placement rates
EPS blocks are easily handled by two workers by hand
3. Construction without utility relocation
No utility replacement that should be considered in the design and selection process.
4. Placement in adverse weather conditions
The higher material cost of EPS block Geofoam are offset by lower installation costs.
5. Alleviates the costs of
Soft soil removal
Excavation widening
Temporary dewatering
Possible need for an excavation support system
6. Saves Time!!!
Solution for soil where estimated time rate of settlement of soil exceeds acceptable standards
Solution for situations where costly corrective fill measures still resulted in significant settlement or stability over time
7. Reduction of lateral stress on bridge approach abutments
Solution for underlying soft soil that is too soft & compressible to carry designed load
8. Allows access to crucial pathways for construction equipment
9. Reduction of Horizontal and Vertical Forces on Structures/Walls
Solution for high lateral loads behind retaining structures
10. Vertical Embankments
Use of a fill geometry with vertical sides as opposed to the more traditional sloped-side geometry will provide the following advantages:
The volume of fill material, especially of the EPS blocks, is minimized, which reduces both material cost and construction time.
The footprint of the embankment and concomitant right-of-way acquisition is minimized, which can have cost, environmental potential, and other benefits.
Alleviation of the need to acquire additional right-of-way to construct flatter embankment slopes because of the low density of EPS blocks and/or the use of a vertical embankment
11. Likely elimination of the need for surcharging and staged construction
12. Decreased maintenance costs
A result of less settlement from the low density of EPS Geofoam &
Excellent durability with a life expectancty of more than 100 years &
Consistent material properties
13. No need for environmental permits
Contains no CFC, HCFC, or HFC
Contains no formaldehyde
Can be recycled
Inert, non-nutritive, highly stable
Will not decompose
Will not decay
Will not produce gases
14. Slope stabilization
15. Vibration dampening
16. Landscape Fill