Visual inspection inside reactor 2 PCV (part 4 of 4) @hilbert00
Visual inspection inside reactor 2 PCV (part 4 of 4)  @hilbert00
Uploaded January 2012 | Updated November 2026, 2 hours ago
On Jan 19, 2012 TEPCO, the operator of the crippled Fukushima Daiichi Nuclear Power Plant, made the first visual inspection inside the primary containment vessel of reactor number 2 using and industrial endoscope.

Pictures and comments (in italian) here:
unico-lab.blogspot.com/2012/01/prime-immagini-da-dentro-il-reattore-2.html

Part 1 of 4: youtu.be/8zoMJM9hr3w
Part 2 of 4: youtu.be/PyT-pAwrpnw
Part 3 of 4: youtu.be/css4IxW3NjA
Part 4 of 4: youtu.be/hEKqAo2aLGw
Visual inspection inside reactor 2 PCV (part 4 of 4)The Evaluation Status of Reactor Core Damage at Fukushima Daiichi (1/2)Exploring Fukushima reactor 2 (part 2 of 6)The Video for the Survey on the Shroud Support Ring of the Reactor of Unit 4, Fukushima Daiichiwater flood on the underground floor of Unit 6 T/B Bamboo CorridorBottom part of S/C of reactor 2 (Fukushima Daiichi)Investigation with a baloon inside reactor 1 at Fukushima (full)in front of Unit 3,4 S/B underground floor cable bolt room (part 1 of 3)Avanzamento costruzione bypass acqua di faldaInvestigation of the Lower Part of Unit 2 Vent Pipewater flood in Unit 6 switchgear room (part 2 of 6)Survey in reactor building 2 at Fukushima Daiichi
Antonio Bulgheroni (toto) |

Visual inspection inside reactor 2 PCV (part 4 of 4)

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER