Visual inspection inside reactor 2 PCV (part 3 of 4) @hilbert00
Visual inspection inside reactor 2 PCV (part 3 of 4)  @hilbert00
Uploaded January 2012 | Updated November 2026, 3 hours ago
On Jan 19, 2012 TEPCO, the operator of the crippled Fukushima Daiichi Nuclear Power Plant, made the first visual inspection inside the primary containment vessel of reactor number 2 using and industrial endoscope.

Pictures and comments (in italian) here:
unico-lab.blogspot.com/2012/01/prime-immagini-da-dentro-il-reattore-2.html

Part 1 of 4: youtu.be/8zoMJM9hr3w
Part 2 of 4: youtu.be/PyT-pAwrpnw
Part 3 of 4: youtu.be/css4IxW3NjA
Part 4 of 4: youtu.be/hEKqAo2aLGw
Visual inspection inside reactor 2 PCV (part 3 of 4)Greeting when visiting Fukushima Daini NPP (1/2)Second inspection in PCV R2 (part 5 of 7)Investigation inside PCV reactor 1 at Fukushima Daiichi (digest)water flood on the underground floor of Unit 6 T/B between TB and MCaccumulated water at Unit 6 high pressure core spray system diesel generator trenchUnderwater inspection of the spent fuel pool 3 at FukushimaImages from inside the buffer tankSituation of J-VillageIAEA Visiting Fukushima Daiichiunderground water inflow at Unit 6 RW trench (part 2 of 7)Fukshima: Mock-up test for alternative thermometer installation
Antonio Bulgheroni (toto) |

Visual inspection inside reactor 2 PCV (part 3 of 4)

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER