Vista Ridge CRU June 2024 @bradmielke4614
Vista Ridge CRU June 2024  @bradmielke4614
Uploaded May 2025 | Updated September 2026, 3 hours ago
Drone video of the vista ridge site during the initial stages of the structural framing install, and the on going underground services (UGS) installation. Most of the video is showing the UGS equipment doing the work of digging, transporting and backfilling.
Vista Ridge CRU June 2024Truck Loading 3First TruckCompact 1Helicopter LiftFill-crete Backfill657 Wheel Tractor Scraper in quad push pullTruck 5Excavator 1Running Casing on a drilled pilewheel loader operationsTrack-hoe moving mud
Brad Mielke for CONENGTECH |

Vista Ridge CRU June 2024

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER