Uploaded May 2026 | Updated November 2026, 2 hours ago
Vera C. Rubin’s Telescope Mount Assembly (TMA) is undergoing balance and dynamic testing on the summit, after the Commissioning Camera was reinstalled in early November.
More information and download options: http://noirlab.edu/public/videos/TMA-Balancing-11-2023-CC/
Credit:
NSF–DOE Vera C. Rubin Observatory/NOIRLab/SLAC/AURA
Vera C. Rubin’s Telescope Mount Assembly (TMA) is undergoing balance and dynamic testing on the summit, after the Commissioning Camera was reinstalled in early November.
More information and download options: http://noirlab.edu/public/videos/TMA-Balancing-11-2023-CC/
Credit:
NSF–DOE Vera C. Rubin Observatory/NOIRLab/SLAC/AURA








![Road to Cerro Tololo Timelapse [4K VR]
More information and download options: http://noirlab.edu/public/videos/CTIO_Road_To_TOLOLO_20220430_DMunizaga-CC/
Credit:
NOIRLab Road to Cerro Tololo Timelapse [4K VR]](https://i.ytimg.com/vi/H9kaEgkw45E/mqdefault.jpg)

