V236-15.0 MW™ delivering on a promise | Episode 4 | Manufacturing ramp up in Poland @vestas
V236-15.0 MW™ delivering on a promise | Episode 4 | Manufacturing ramp up in Poland  @vestas
Uploaded September 2024 | Updated September 2026, 2 weeks ago
Here’s a glimpse inside our nacelles factory in Poland, where we're preparing to deliver our first commercial offshore wind projects: He Dreith and Baltic Power.

Since its launch, the V236-15.0 MW has been on an impressive journey:
◾ 2022: Prototype manufactured and installed
◾ 2023: Extensive testing and verification completed, leading to Type Certification

Now ready for commercial use, the turbine has secured around 13 GW in firm orders and preferred supplier agreements globally. Watch this video to explore how we're working to fulfil these commitments.
V236-15.0 MW™ delivering on a promise | Episode 4 | Manufacturing ramp up in PolandWindEurope with Anders Bach Andersen, Director Product Market StrategyHow much electricity does 100 GW generate?V236-15.0 MW™ - Delivering on a promise | Episode 1: The nacelleVestas at Husum 2025 - Wrap UpCome viene prodotta l’energia Eolica? - Sustainability for kids Part 1 | Vestas (Italian)Vestas at Husum 2025 - Technology BreakfastWindEurope 2026 with Elena Arias Losada, SVP, Head of Service, Vestas MEDEEG 2027: Welche Chancen ergeben sich für die Windenergie? | Einfach erklärtWindEurope 2026 with Juan Furones, SVP Onshore Product Line
Vestas |

V236-15.0 MW™ delivering on a promise | Episode 4 | Manufacturing ramp up in Poland

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER