US 191 Realigned Update Video @UtahDOT
US 191 Realigned Update Video  @UtahDOT
Uploaded September 2025 | Updated November 2026, 3 hours ago
The US-191 Realignment Project is replacing the 2.6 mile switchback portion of the highway located 12 miles north of Vernal with an alignment with fewer turns and standard horizontal curves. The proposed improvements will enhance safety by adding a continuous uphill climbing lane and a southbound passing lane, eliminating the switchbacks and providing standard horizontal curves, optimizing grades to help trucks negotiate curves, installing a runaway truck ramp, and providing standard width shoulders.
US 191 Realigned Update VideoUDOiT - Region 3 Specialty CrewLegacy Parkway State Environmental Study (SES) - OverviewUDOT Recycling RoadsA Data Driven Analysis of Transportation Infrastructure Equity in Utah – 2024Meeting of the Utah Transportation Commission September 25, 2026Meeting of the Utah Transportation Commission December 12, 2025Sonic soil testingSnow Plow Pre-EmptionShepard Lane Bridge Demolition: Part OneUDOT Crews Clearing Wolf Creek PassCentral Utah Technology
Utah Department of Transportation |

US 191 Realigned Update Video

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER