Uploaded July 2026 | Updated September 2026, 2 weeks ago
The final switch track location for the ride is now going in! New columns were placed ontop of the switch table, and the track should be on location soon. Catwalks along the final brake run was also the focus since our last update, as we can now see a bunch of new ones that have been added near the station/maintenance barn. We visited the laydown lot, and thankfully there is a ton of new track/colums loaded up on trucks, ready to head to the job site!
#fastandfurious #themepark #rollercoaster #construction #hollywooddrift
FOLLOW US AT:
facebook.com/MidwayMayhem
instagram.com/midwaymayhem
twitter.com/Midway_Mayhem
midwaymayhem.com
The final switch track location for the ride is now going in! New columns were placed ontop of the switch table, and the track should be on location soon. Catwalks along the final brake run was also the focus since our last update, as we can now see a bunch of new ones that have been added near the station/maintenance barn. We visited the laydown lot, and thankfully there is a ton of new track/colums loaded up on trucks, ready to head to the job site!
#fastandfurious #themepark #rollercoaster #construction #hollywooddrift
FOLLOW US AT:
facebook.com/MidwayMayhem
instagram.com/midwaymayhem
twitter.com/Midway_Mayhem
midwaymayhem.com










