Uploaded July 2026 | Updated September 2026, 2 weeks ago
Loose ends are getting tied up for the layout, and we now have the snappy turn the leads into the s-bend complete! The turn from the mid-course to switch, lead out of the overbank, & the element that goes from the launch to mini speed bump section are all that remain to connect by the CityWalk area of the ride. The second segment of track needed to complete the switch is also now in, and we can see the tower structure by the concert stage rising higher.
#fastandfurious #hollywooddrift #construction #themepark #rollercoaster #universal
FOLLOW US AT:
facebook.com/MidwayMayhem
instagram.com/midwaymayhem
twitter.com/Midway_Mayhem
midwaymayhem.com
Loose ends are getting tied up for the layout, and we now have the snappy turn the leads into the s-bend complete! The turn from the mid-course to switch, lead out of the overbank, & the element that goes from the launch to mini speed bump section are all that remain to connect by the CityWalk area of the ride. The second segment of track needed to complete the switch is also now in, and we can see the tower structure by the concert stage rising higher.
#fastandfurious #hollywooddrift #construction #themepark #rollercoaster #universal
FOLLOW US AT:
facebook.com/MidwayMayhem
instagram.com/midwaymayhem
twitter.com/Midway_Mayhem
midwaymayhem.com










