Uploaded November 2026 | Updated November 2026, 8 hours ago
Netting is now installed for the high-speed turn before the mid-course brake run, and the ride entry building continues to take shape! More smoothening of the track has also happened, and the evac platforms for launch 1 are now complete! Tons of creative people have been spotted around the site recently for what we hope is power testing soon, and speaking of testing, Jurassic Park River Adventure is doing just that! Mythos pathway rockwork demo is still going strong, and we take a trip through the new tribute store!
#themeparks #rollercoaster #fastandfurious #hollywooddrift #construction
FOLLOW US AT:
facebook.com/MidwayMayhem
instagram.com/midwaymayhem
twitter.com/Midway_Mayhem
midwaymayhem.com
Netting is now installed for the high-speed turn before the mid-course brake run, and the ride entry building continues to take shape! More smoothening of the track has also happened, and the evac platforms for launch 1 are now complete! Tons of creative people have been spotted around the site recently for what we hope is power testing soon, and speaking of testing, Jurassic Park River Adventure is doing just that! Mythos pathway rockwork demo is still going strong, and we take a trip through the new tribute store!
#themeparks #rollercoaster #fastandfurious #hollywooddrift #construction
FOLLOW US AT:
facebook.com/MidwayMayhem
instagram.com/midwaymayhem
twitter.com/Midway_Mayhem
midwaymayhem.com










