Uploaded January 2021 | Updated September 2026, 3 weeks ago
The lift is fully constructed and operational. However, there are several improvements to be done that will increase its quality and functionality. Among those changes are adding 3 way switches, muffling the noise of the marbles exiting at the top, and pinning the drive shaft to the roller so it's forced to rotate. In order to fully test it, I'll need to build a marble machine to complete the circuit. So that's what I'll start doing next! Enjoy!
Check out my Patreon here for exclusive and advance content: patreon.com/bentardif
Follow me on Instagram for more current updates:
instagram.com/bentardif
Tools I use: amazon.com/shop/bentardif
Music by: David Cutter Music - davidcuttermusic.com
The lift is fully constructed and operational. However, there are several improvements to be done that will increase its quality and functionality. Among those changes are adding 3 way switches, muffling the noise of the marbles exiting at the top, and pinning the drive shaft to the roller so it's forced to rotate. In order to fully test it, I'll need to build a marble machine to complete the circuit. So that's what I'll start doing next! Enjoy!
Check out my Patreon here for exclusive and advance content: patreon.com/bentardif
Follow me on Instagram for more current updates:
instagram.com/bentardif
Tools I use: amazon.com/shop/bentardif
Music by: David Cutter Music - davidcuttermusic.com









