Uploaded February 2024 | Updated September 2026, 3 weeks ago
Proven performance
Porous, fast draining car park surface for large logistics centre.
Around 2500 tonnes of UltiSuDS was supplied to the site and laid by the contractor Luddon construction. Using ULTISuDS as part of a full infiltration system avoided the need for additional groundwork to install additional drainage systems which reduced costs and avoided extended site closure. The new porous surface was tested shortly after installation as part of a demonstration of the drainage capability of the SuDS system (see video). The results were impressive, with the system performing exactly as designed.
Find out more at tarmac.com/ultisuds
#porous
#asphalt
#carparking
Proven performance
Porous, fast draining car park surface for large logistics centre.
Around 2500 tonnes of UltiSuDS was supplied to the site and laid by the contractor Luddon construction. Using ULTISuDS as part of a full infiltration system avoided the need for additional groundwork to install additional drainage systems which reduced costs and avoided extended site closure. The new porous surface was tested shortly after installation as part of a demonstration of the drainage capability of the SuDS system (see video). The results were impressive, with the system performing exactly as designed.
Find out more at tarmac.com/ultisuds
#porous
#asphalt
#carparking










