two Hitachi 350 bridge demolition @ConstructionWorldXiuMeiHe
two Hitachi 350 bridge demolition  @ConstructionWorldXiuMeiHe
Uploaded September 2025 | Updated November 2026, 2 hours ago
"There is currently no demolition work underway on a major bridge in Neuss; instead, the bridge at the "Spaghetti Junction" (connecting the A57) is closed due to damage to the substructure, with demolition work scheduled to be completed by mid-September 2025. The Josef Cardinal Frings Bridge (South Bridge) between Neuss and Düsseldorf must be demolished and rebuilt because a complete renovation is not possible. The State Road Authority of North Rhine-Westphalia plans to keep the bridge open for traffic through extensive renovation work until the new bridge is completed (in approximately 15 years)."
Source: Google AI, September 25, 2026, 8:15 PM
two Hitachi 350 bridge demolitionExcavator Hitachi KTEG 400 P 7 demolition siteDemag AC 300 and a new tower section for the craneExcavator CAT 385 B demolition site (13.09.2024)Excavator Kobelco SK 300Excavator CAT 385 - demolition siteExcavator CAT 385 B  - longfront demolition siteLiebherr crane LTM 1230 5.1 cranes ship Aalschokker old harbor of DüsseldorfLiebherr LTM 1450 8.1 in the morningConcrete mixers without endExcavator CAT 349 E - demolition siteExcavator Kiesel KMC 600P-7 and the rest of the church tower
Construction World |

two Hitachi 350 bridge demolition

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER