Uploaded June 2026 | Updated September 2026, 2 weeks ago
Pumping 1250 cubic yards of concrete with two Putzmeister Concrete Pumps and getting the slab laser level with a Somero S-940 laser screed.
Pumping 1250 cubic yards of concrete with two Putzmeister Concrete Pumps and getting the slab laser level with a Somero S-940 laser screed.










