This job was a very challenging one, the company laying the drains in a new housing estate was not making fast progress, they had a 35 Tonne excavator hammering the basalt and although it was getting through it, it was painful. The challenge was this, can I pull off a very conservative blast, just enough to aid excavation and not exceed the mandated vibration limit and be cost effective? A short test section was drilled, loaded and fired, how did we go? Well we set a new record for the number of drill rods irretrievably stuck in one day and the vibration measurement was right up against the limit. The border line vibration measurement rang some alarm bells and the dig out was tight, but still a lot better than the not blasted section. After some head scratching we concluded that much better fragmentation could be attained by reducing the hole diameter so that the explosive would be more evenly distributed over the length of the hole and switching to a dice 5 drilling pattern, this was the only option as we could not increase the explosive mass per hole or we would exceed the vibration limit. This change would substantially increase the cost per meter and make it not viable, so the test concluded at this point.
Please hit the like button and subscribe, that really helps.
Also follow us on Facebook - facebook.com/demolitiondaverockblasting
This job was a very challenging one, the company laying the drains in a new housing estate was not making fast progress, they had a 35 Tonne excavator hammering the basalt and although it was getting through it, it was painful. The challenge was this, can I pull off a very conservative blast, just enough to aid excavation and not exceed the mandated vibration limit and be cost effective? A short test section was drilled, loaded and fired, how did we go? Well we set a new record for the number of drill rods irretrievably stuck in one day and the vibration measurement was right up against the limit. The border line vibration measurement rang some alarm bells and the dig out was tight, but still a lot better than the not blasted section. After some head scratching we concluded that much better fragmentation could be attained by reducing the hole diameter so that the explosive would be more evenly distributed over the length of the hole and switching to a dice 5 drilling pattern, this was the only option as we could not increase the explosive mass per hole or we would exceed the vibration limit. This change would substantially increase the cost per meter and make it not viable, so the test concluded at this point.
Please hit the like button and subscribe, that really helps.
Also follow us on Facebook - facebook.com/demolitiondaverockblasting