Transformers soon to début at Fukushima Daiichi NPS. @OfficialTEPCOen
Transformers soon to début at Fukushima Daiichi NPS.  @OfficialTEPCOen
Uploaded February 2015 | Updated November 2026, 5 days ago
A mock up of a transformable investigation robot has undergone testing at a lab. This robot, equipped with camera and dosemeter, plus thermometer, has been developed by IRID** and Hitachi-GE Nuclear Energy, Ltd. to explore deep inside the PCV* of Unit 1 and record the current conditions inside the vessel. This work is too hazardous for humans because of high radiation.
Transformers soon to début at Fukushima Daiichi NPS.Survey on the inside of Unit 3 Spent Fuel Pool cask yardBackground and Scientific Explanation for the Discharge of Treated Water2014/8/5 Measures to stop water - Differences between freezing the trench water and the Ice WallInterview of TEPCO emplyees of Fukushima DaiichiTEPCO Shorts  ALPS treated water  #01 What is ALPS treated water?2022.03.15 Preparing to Retrieve Fuel Debris from Fukushima Daiichi Nuclear Power Station Unit 22014.1.20 Comments regarding our revised Special Business PlanTEPCO Shorts ALPS treated water #06 How does tritium impact the human body?【Unit3 SFP 2012 9.26】Investigation of the inside of Unit 3 spent fuel pool,Fukushima Daiichi③2015.10.14 Fukushima Reconstruction: Evacuation Ban Lifted on Naraha TownTraining for New Engineers Since March 2011.
OfficialTEPCOen |

"Transformers" soon to début at Fukushima Daiichi NPS.

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER