Toplight C - Nobu Hotel @tarmacltd
Toplight C - Nobu Hotel  @tarmacltd
Uploaded September 2020 | Updated November 2026, 11 hours ago
The lightweight concrete mix design LC30/33 D1.8 with a density of1600-1800kg/m3, containing structural lightweight aggregates was pumped 40 metres vertically on to the new composite deck floor. By adding steel fibres into the lightweight mix the composite metal deck system could be installed without the need for traditional expensive and slow steel reinforcement across the deck. The use of lightweight concrete, furthermore, reduced the load by 35% which meant the existing structure did not need to be reinforced or under pinned. The construction programme time was also reduced considerably which insured completion of the work was done in the shortest time possible and NOBU hotel could quickly resume business as normal.
Toplight C - Nobu HotelTarmac Careers - Reinvent Your WorldULTIPATCH SITEMIX - Fresh batch-heated asphalt on demandUltitrack Motorsport at Croft CircuitTarmac Careers - Reinvent Your WorldLow Carbon AI Concrete - CEVO DigitalACTing On Net ZeroTarmac Careers - National Apprenticeship Week 2021Low Temperature Asphalt - ULTILOWSlapton Sands single layer asphalt case studyUnderstanding Polymer Modified Bitumens (PMBs)Using Innovative concrete in Glasgow
Tarmac |

Toplight C - Nobu Hotel

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER