Uploaded September 2020 | Updated November 2026, 11 hours ago
The lightweight concrete mix design LC30/33 D1.8 with a density of1600-1800kg/m3, containing structural lightweight aggregates was pumped 40 metres vertically on to the new composite deck floor. By adding steel fibres into the lightweight mix the composite metal deck system could be installed without the need for traditional expensive and slow steel reinforcement across the deck. The use of lightweight concrete, furthermore, reduced the load by 35% which meant the existing structure did not need to be reinforced or under pinned. The construction programme time was also reduced considerably which insured completion of the work was done in the shortest time possible and NOBU hotel could quickly resume business as normal.
The lightweight concrete mix design LC30/33 D1.8 with a density of1600-1800kg/m3, containing structural lightweight aggregates was pumped 40 metres vertically on to the new composite deck floor. By adding steel fibres into the lightweight mix the composite metal deck system could be installed without the need for traditional expensive and slow steel reinforcement across the deck. The use of lightweight concrete, furthermore, reduced the load by 35% which meant the existing structure did not need to be reinforced or under pinned. The construction programme time was also reduced considerably which insured completion of the work was done in the shortest time possible and NOBU hotel could quickly resume business as normal.










