Timber Garage Strip Foundations and Blockwork @lrworkshop
Timber Garage Strip Foundations and Blockwork  @lrworkshop
Uploaded October 2025 | Updated November 2026, 3 hours ago
With the trenches being finished off, it was time to fill them with concrete and build up some blockwork to retain the slab.

0:00 Final trench digging
0:25 Concrete pour
2:00 Cracks? Shrinkage?
3:26 It's a big building!
3:49 Remedial work
4:21 Radon sump preparation
4:43 Blockwork
7:02 Looking after the blocks
8:00 Will the slab crack?
9:20 Building the slab
10:18 Floor level height and door recess
11:32 Reason for door width

LR Workshop: lrworkshop.com
Instagram: instagram.com/lr_workshop

The videos are for entertainment only. I am not a professional mechanic!
Timber Garage Strip Foundations and BlockworkThe Mythical Swivel Bolt - UYG500040/TYG100580/FTC3454Wear and tear on Defenders that live offroadOur Defender rollover! The story behind the photoTrampoline Springs the Easy Way with One Simple ItemA Hose Clip did this - Stranded by Coolant LossBackstreet Defender Mechanic: First start & ServicingHow the Army checks its Balls (FTC5366)I saw the Grenadier. What do you want to know?Sidelights Work, Headlights Dont - plus RHD conversion and alignment - MOT PrepMahle Oil Filters: Austria vs China Manufacturing. Two 300Tdis with 112k and 200k milesExploring modern 4x4 features as a CAVE dweller
LR Workshop & Expedition |

Timber Garage Strip Foundations and Blockwork

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER