thorconpower.com Plants are built complete in a shipyard, towed to a site in Indonesia, ballasted to the seabed, and then connected to the grid.

Costs are estimated at $1.2B for a 1GWe site. Largely verified by DSME and Doosan.

A large shipyard can produce 20 Gwe/year.

Build time is 1 year. Time from permits and land to grid power is 2 years.
Electricity costs are $0.03 USD/kWhr.

Can compete directly with coal in the developing world.

Recent change is the addition of the vault – dry cask storage for 80 years operation by adding 5m to the 180m long hull.
Thorcon 2021-10 Update - Lars Jorgensen @ ORNL MSRW 2021Dr. Robert Hargraves - ThorCon: Power Up Our World @ TEAC8Dr. Stephen Boyd - High-Temperature Chemistry with Molten Salt ReactorsThorium 2017Thorium Health Physics -by Melton Chew @ TEAC7Rare Earth Elements & Thorium Legislative Efforts - Jim Kennedy @ TEAC7Renewables in Germany (Energiewende!) and Nuclear in France (Clean Energy!)Greens go Nuclear? Green Party of Canadas Nuclear/SMR Roundtable. Presented as GPC Nuclear Debate!Mathijs Beckers - Copper Crunch @ TEAC8Hamid Abderrahim of MYRRHA - New Research Infrastructure in Belgium @ ThEC2018Restoring Relevance to Nuclear Energy - Future Innovation Strategies - Magdi Ragheb @ TEAC82015 Demolition of Calgarys Crowchild Trail Flanders Overpass - 48 hours of destruction in realtime
gordonmcdowell |

Thorcon 2021-10 Update - Lars Jorgensen @ ORNL MSRW 2021

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER