This is the NORTH-SOUTH COMMUTER RAILWAY (NSCR) PROJECT @AngLitratistaNgDaangBakal
This is the NORTH-SOUTH COMMUTER RAILWAY (NSCR) PROJECT  @AngLitratistaNgDaangBakal
Uploaded March 2022 | Updated November 2026, 2 hours ago
A STATE-OF-THE-ART
RAPID CATALYST FOR PROGRESS

This is the NORTH-SOUTH COMMUTER RAILWAY (NSCR) PROJECT.

Under the visionary leadership of Secretary Art Tugade, the Department of Transportation (DOTr) and the Philippine National Railways (PNR) are relentless in ushering a mammoth railway network in the country, with a massive 147-km rail transport route, comprising of 37 stations and 464 train cars.

This mega railway system that stretches across 28 cities and municipalities within the three regions of Central Luzon, National Capital Region, and CALABARZON, is expected to serve over a million passengers a day once fully operational.

The NSCR encompasses three (3) railway projects, including the PNR Clark Phase 1 (Tutuban - Malolos)—a 38-km. rail line that will connect Tutuban, Manila to Malolos, Bulacan, and will significantly reduce travel time from 1 hour and 30 minutes to just 30 minutes.

Today, the DOTr and PNR unveiled the first and LONGEST 8-car train set for the Clark Phase 1 project, that measures 160 meters in length, and has an operational speed of 120kph—enabling to serve over 2,228 passengers per train set.

Another segment is the PNR Clark Phase 2 (Malolos-Clark), a 53-km rail line leg that will trim down travel time from Malolos City, Bulacan to Clark, Pampanga from 2 hours to just 30-35 minutes. It will also feature the first-ever Airport Railway Express Service that will connect Makati City to Clark International Airport from the current 2-3 hours travel time to just 55 minutes.

Also today, a back-to-back contract signing for an additional 304 train cars (38 8-car train sets) for the 147 kilometer NSCR System was likewise held.

Lastly, the PNR Calamba (Solis-Calamba), which is a 56-kilometer train line, is the southern line which will connect Metro Manila (Solis Street, Tondo) and Calamba, Laguna, that will speed up travel time to one (1) hour, from the current four (4) hours.

The project is co-financed by the Asian Development Bank (ADB) and the Japan International Cooperation Agency (JICA).

Move more people, make commuting more comfortable, convenient and efficient, and bolster economic progress and socio-economic opportunities--these are the long-term aspirations of the NSCR project for the Filipino people.

Indeed, after long decades of waiting to implement this massive project, it is finally gaining ground and moving at top speed, with real progress and development.

This is #BUILDBUILDBUILD.
This is #DuterteLegacy.

#DOTrPH🇵🇭 #NSCR #RailwaysSectorWorks #BUILDBUILDBUILD
This is the NORTH-SOUTH COMMUTER RAILWAY (NSCR) PROJECTPNR PT Inka 8103 passing under Dimasalang BridgeLRT-1 Cavite Extension Trainspotting in 5 StationsLRT-1 4th Generation LRV in Monumento StationPNR Trains Compilation (August to October 2023)PNR Clark Phase 1 First Trainset in Malanday Depot / JTREC Sustina TrainPNR Trains in Leonor Rivera Crossing [August 2022]PNR DEL 919 as Rescue Train of DEL 921 in España Blvd CrossingMRT-3 Front Cabin View (Taft - Magallanes)PNR PT Inka DMU & Hyundai Rotem in Blumentritt StationPNR DMU Rotem Departs in Blumentritt StationPNR Trains in Zobel Roxas Street Crossing [Aug 2022]
Ang Litratista ng Daang-Bakal |

This is the NORTH-SOUTH COMMUTER RAILWAY (NSCR) PROJECT

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER