PROJECT OBJECTIVES:
- Improve system power factor from 0.76 up to 0.96
- Reduce network losses (cca. 9%)
- Avoid penalty charges from utilities for excessive consumption of reactive power (SLO market 0,0085€/kVAr)
- Increase system capacity and save cost on new installations
- Increase power availability
ACHIEVED: Monthly savings 817€!
More information: http://www.etigroup.eu/solution/reactive-power-compensation
PROJECT OBJECTIVES:
- Improve system power factor from 0.76 up to 0.96
- Reduce network losses (cca. 9%)
- Avoid penalty charges from utilities for excessive consumption of reactive power (SLO market 0,0085€/kVAr)
- Increase system capacity and save cost on new installations
- Increase power availability
ACHIEVED: Monthly savings 817€!