The Gobbins RT Project commenced with the removal of Bridge 15 at Gordons Leap Inlet in September 2023 using a 350T crane.

Once removed, ‘Cliff Scaling’ works was undertaken to remove loose material from the rock blocks across the sub-vertical cliff face. This was all undertaken using rope access from the top of the cliff.

Rockfall high tensile mesh with mesh anchors were then installed over the crest of the slope. Specific rocks were retained through the installation of stop rock dowels, and a 500kJ rockfall catch fence was also installed.

During this time maintenance was carried out on the path either side of the bridge and on the bridge itself. Once all cliff works and repairs works were complete, the bridge was lifted back into place on the 30th November 2023. The cliff top path and fence, which had been removed to facilitate the works and rope access, were then reinstalled.
The Gobbins RT ProjectFP McCann - Russells Construction Motel One Piccadilly HDThe Big Bridge WorkshopFP McCann Waste Water Treatment Precast Filter Bed Installation at BiggarFP McCann Multi Load Offering AnimationFP McCanns Dunfermline Learning Campus, FifeFP McCann Mesh Frame Manufacturing ProcessFP McCann StormStore Animation v2 0Installation Series - Bagged Products - Paving GroutA look into FP McCanns Lansdowne PRS Project Hagley Road, BirminghamFP McCann Data Centre Construction CapabilityUnderstanding Roof Tile Efflorescence
FP McCann |

The Gobbins RT Project

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER