Uploaded May 2015 | Updated November 2026, 3 hours ago
The G500 took off at 10:39 a.m. May 18, 2015 from Savannah-Hilton Head International Airport, with Gulfstream experimental test pilots Scott Martin and Kevin Claffy at the controls. Flight Test engineer Bill Osborne provided on-board support.
The aircraft climbed to an initial altitude of 10,500 feet/3,200 meters and reached a maximum altitude of 15,000 ft/4,572 m. During the 2-hour-and-16-minute flight, the crew exercised all primary flight control systems; evaluated handling qualities in takeoff and landing configurations; performed a simulated approach and go-around; and checked all systems using the SymmetryTM flight deck touchscreen controllers. The aircraft achieved a maximum air speed of 194 knots. It landed back in Savannah at 12:55 p.m. local time.
The G500 took off at 10:39 a.m. May 18, 2015 from Savannah-Hilton Head International Airport, with Gulfstream experimental test pilots Scott Martin and Kevin Claffy at the controls. Flight Test engineer Bill Osborne provided on-board support.
The aircraft climbed to an initial altitude of 10,500 feet/3,200 meters and reached a maximum altitude of 15,000 ft/4,572 m. During the 2-hour-and-16-minute flight, the crew exercised all primary flight control systems; evaluated handling qualities in takeoff and landing configurations; performed a simulated approach and go-around; and checked all systems using the SymmetryTM flight deck touchscreen controllers. The aircraft achieved a maximum air speed of 194 knots. It landed back in Savannah at 12:55 p.m. local time.










