Testing the limits  - Part 2 - Finishing the giant spacer on the old South Bend 14 1/2 lathe @dynoguy
Testing the limits  - Part 2 - Finishing the giant spacer on the old South Bend 14 1/2 lathe  @dynoguy
Uploaded November 2017 | Updated September 2026, 3 weeks ago
Finally the laser cut parts arrived so we can carry on with making parts for the mystery project.
But before we do this, another job gained some priority.
What we making here is a large spacer for something we'll show somewhere at the end of this video, ... part 1 is here :
youtu.be/sJba2Tg4ar8

The Diesel Generator project playlist is here
youtube.com/playlist?list=PLJ5sckhk3niksLfKavlHqnvTfIbP4d3bY

This big lump of steel just fits on the old South Bend 14.5" lathe, the final diameter is about 360mm (14.2"). I was quite surprised how big the lathe actually is, because even a 15" part would just turn fine without rubbing, Seems in 1942 they haven't invented the inflated specs we used to see nowadays.
Anyway, it's a rather simple part, a bit of welding and turning, a few steps and parallel surfaces, then dividing and drilling some holes and hoping it fits. No particular challenges so far, except that the calipers were about 10mm too short so we had to do a slight modification to it.

This is the last part under this title, the other parts and assembly of the unit will come soon under a different title, so please stay tuned.

The playlist for the mystery project is here:
youtube.com/playlist?list=PLJ5sckhk3ninWKp5_LuLqT90IH8TIbbHf


(c) 2017
dynoguy.co.uk
Testing the limits  - Part 2 - Finishing the giant spacer on the old South Bend 14 1/2 latheTool + Machinery Auction, Part 1 - checking out whats on sale (January 2018)Volvo V50 Front Suspension, Ep#5 , finally putting it back togetherScotland road trip 2017 - Part 3, Ardnamurchan Lighthouse, engine room and tower tourThe Mystery Project - Part 8, some parts coming together, making chips and a few teasersEimac 4CX1500  Power Transmitting Tube - bench test setup + explanationCherokee oil filter adapter bolt removal, making o-rings (XJ 4.0 ERH engine leak fix)Air Compressor - Poor Performance - fixing leaking reed valveSome lawn mowers, project updates,a dead battery and some sheepThe Mystery Project - Part 14, frame parts, turning 2nd bearing carrier2 sick Westwood garden tractors , Part 2 - the final result (T1200 lawn mower, ride on mower)Auction Scores 21-10, Kempi MIG welding torches, switch gear and some random bits
dynoguy |

Testing the limits - Part 2 - Finishing the giant spacer on the old South Bend 14 1/2 lathe

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER