Uploaded September 2025 | Updated November 2026, 3 hours ago
Watch the delivery crew answer the mystery as to why no gantry crane was set-up outside the factory as with past stamping press deliveries.
This is a delicate operation with extremely high stakes if something were to go wrong.
This 250,000 lb stamping press was carefully and slowly delivered from Giga Texas where it has been stored while the Giga Semi factory was built. That moment is here as the Giga Semi production lines are currently being built.
September 9, 2025
Watch the delivery crew answer the mystery as to why no gantry crane was set-up outside the factory as with past stamping press deliveries.
This is a delicate operation with extremely high stakes if something were to go wrong.
This 250,000 lb stamping press was carefully and slowly delivered from Giga Texas where it has been stored while the Giga Semi factory was built. That moment is here as the Giga Semi production lines are currently being built.
September 9, 2025










